bunny rabbit saying love drawing of dacha off-grid homestead trees and hills wood and axe strawbale cottage reading in a hammock off-grid diesel generator carpentry tools beds of vegetables and flowers in a garden cattails in a natural water treatment pond

Progress Report: West Side with Footers for the Addition

July 22, 2010 by LeaLSF

North side of the main house with footers and the start of foam for the addition.

If you check for the previous photo of the week you will see almost the same view, but some things have changed. For one the wing wall has been knocked out to make room for the addition. The berm, which is the earth piled up behind the wing wall, has been removed. The area next o the house has been leveled, and graveled. The back and side footers have been poured, and what we see Danila and Joe doing in the corner is stacking block. The pipes you see by Danila and Joe are for septic. They are currently working right by the bathroom. I will try to remember that one day when I’m brushing my teeth in that bathroom with some herby toothpaste or something else that makes brushing teeth more fun. Yey.

The foam on the ground is for insulation, and eventually the entire area will be covered with it.

The front footer has not been poured with the rest, b/c it will be poured with the slab (floor) itself to ensure extra strength.  The foam on the side of the building is to insulate the wall where bermed earth used to fulfill that function.

More updates soon!

-Lea LSF

Related posts:

  1. Photo of Week: West Side
  2. Earth-bermed, passive solar Common House .vs. Snowmaggedon 2010
  3. Recycled Wine Bottles Add Good Churchy Feeling
  4. The Dacha Gets Plastered
  5. Straw Bale Hijinks

Comments

Leave a Reply





  • Bookmark and Share